GENYINTL
Product Center
When testing three-phase energy meters where the voltage and current measurement circuits cannot be separated (closed links), it is necessary to isolate the voltage and current circuits. In multi-meter inspection, due to the complexity of three-phase circuits, the voltage isolation method can no longer meet the needs of actual inspection, and current isolation method is needed to ensure the inspection accuracy.